* Size rounded off to the nearest footBUILDING DIMENSIONSBUILDING DIMENSIONSBUILDING DIMENSIONSBUILDING DIMENSIONSBUILDING DIMENSIONSCAUTION: SOME PAR
It is important that the entire floor frame be anchored after the building is erected.It is important that the entire floor frame be anchored after th
116624266242662426624266242Door Slide (2)Door Slide (2)Door Slide (2)Door Slide (2)Door Slide (2)6638266382663826638266382Lower Door Guide (2)Lower Do
Parts ListParts ListParts ListParts ListParts List12Assembly Part PartKey No. Number Description Carton 1 Carton 2 Carton 3 Carton 4 Carton 5 1 7023
13AssembAssembAssembAssembAssembllllly by by by by by Ky Ky Ky Ky Keeeeey No. fy No. fy No. fy No. fy No. for 14x21 Buildingor 14x21 Buildingor 14x21
PPPPParararararts List fts List fts List fts List fts List for Roll-Up-Door & or Roll-Up-Door & or Roll-Up-Door & or Roll-Up-Door & or
15AssembAssembAssembAssembAssembllllly by by by by by Ky Ky Ky Ky Keeeeey No. Roll-Up Door & 1431 Buildingy No. Roll-Up Door & 1431 Buildingy
1666434 (2)66434 (2)66434 (2)66434 (2)66434 (2)#10-32 x 2 1/2" Flat#10-32 x 2 1/2" Flat#10-32 x 2 1/2" Flat#10-32 x 2 1/2" Flat#10
1 1 1 1 1 Assemble 1/2 truss at a time. At-tach column gusset column gusset column gusset column gusset column gusset to lower chord lower chord lowe
The gables go on top of the front andrear walls to support the roof beams.The center columns support the trussand the framework.NOTENOTENOTENOTENOTETh
The roof beams join the gables to thetruss and supports the roof panels.1 1 1 1 1 Align the holes on a left left left left left and right right right
2Owner's ManualOwner's ManualOwner's ManualOwner's ManualOwner's ManualBefore beginning construction, check local building co
1 1 1 1 1 Place the floor frame pieces on thefoundation. Assemble the 4 cornersof the floor frame using 3 bolts fromthe bottom with nuts on top at ea
1 1 1 1 1 Fasten side floor frames togetherwith a column gussetcolumn gussetcolumn gussetcolumn gussetcolumn gusset using 2 boltsfrom the bottom and n
NOTENOTENOTENOTENOTEThe remainder of the buildingassembly requires many hoursand more than one person. Tiedown and support assemblybefore the end of
The mid frame pieces give rigidity tothe sides and rear wall.NOTENOTENOTENOTENOTE Before installing side wallchannels decide at which locationyou wan
1 1 1 1 1 Position right side eave channelright side eave channelright side eave channelright side eave channelright side eave channelagainst support
1 1 1 1 1 Fasten front frames front frames front frames front frames front frames at the top tofront wall panels with 3 screws. Donot fasten hole nea
1 1 1 1 1 Position Truss Assembly on build-ing by sliding column gussets overcenter columns and fasten with 8bolts and nuts on each gusset.2 2 2 2 2 P
Each wall panel has a crimped rib on1 side. The crimped rib should gounder the rib of the panel that followsit.1 1 1 1 1 Fasten the wall panelswall p
Step 12Step 12Step 12Step 12Step 12BX28● Parts Needed For ●WWWWWall Channel/Door Jall Channel/Door Jall Channel/Door Jall Channel/Door Jall Channel/Do
Step 13Step 13Step 13Step 13Step 13BX29● Parts Needed For ●Gable/Roof BeamsGable/Roof BeamsGable/Roof BeamsGable/Roof BeamsGable/Roof Beams●●●●● Right
3Selecting and PrSelecting and PrSelecting and PrSelecting and PrSelecting and Preeeeeparparparparparing ing ing ing ing YYYYYour Site:our Site:our Si
30●●●●● Roof Beam Assembly (8) Roof Beam Assembly (8) Roof Beam Assembly (8) Roof Beam Assembly (8) Roof Beam Assembly (8)●●●●● Left Gable Assembly (2
31●●●●● 6954 Gable-Truss Strut 6954 Gable-Truss Strut 6954 Gable-Truss Strut 6954 Gable-Truss Strut 6954 Gable-Truss Strut (4 14x21) (2 14x31)
32Squaring the BuildingSquaring the BuildingSquaring the BuildingSquaring the BuildingSquaring the BuildingStep 16Step 16Step 16Step 16Step 16STEP1111
33● Parts Needed For ●Left/Right Roof PanelsLeft/Right Roof PanelsLeft/Right Roof PanelsLeft/Right Roof PanelsLeft/Right Roof PanelsStep 17Step 17Step
34● Parts Needed For ●Roof PanelsRoof PanelsRoof PanelsRoof PanelsRoof PanelsStep 18Step 18Step 18Step 18Step 18STEPSTEP33333BX34●●●●● 9491 Roof Panel
35● Parts Needed For ●Ridge CapRidge CapRidge CapRidge CapRidge CapStep 19Step 19Step 19Step 19Step 19BX35●●●●● 9509 Ridge Cap (1) 9509 Ridge Cap (1)
36● Parts Needed For ●Roof Panels & Ridge CapRoof Panels & Ridge CapRoof Panels & Ridge CapRoof Panels & Ridge CapRoof Panels & Ri
37● Parts Needed For ●Roof Panels/Ridge CapsRoof Panels/Ridge CapsRoof Panels/Ridge CapsRoof Panels/Ridge CapsRoof Panels/Ridge CapsStep 21Step 21Step
38● Parts Needed For ●Roof Roof Roof Roof Roof TTTTTrrrrrimimimimimStep 22Step 22Step 22Step 22Step 22BX38●●●●● 7023 Left Roof trim (2) 7023 Left Roof
39● Parts Needed For ●Side Door Side Door Side Door Side Door Side Door AssembAssembAssembAssembAssemblllllyyyyyStep 23Step 23Step 23Step 23Step 23BX3
4Safety precautions are important to follow throughout the construction of your building.Safety precautions are important to follow throughout the con
40● Parts Needed For ●Door InstallationDoor InstallationDoor InstallationDoor InstallationDoor InstallationStep 24Step 24Step 24Step 24Step 24BX40Door
41● Parts Needed For ●Roll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorStep 25Step 25Step 25Step 25Step 25BX41●●●●● Door Panels (4) Door Pa
42● Parts Needed For ●Roll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorStep 26Step 26Step 26Step 26Step 26BX42●●●●● 9507 Door Panel Lock Se
43● Parts Needed For ●Roll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorStep 27Step 27Step 27Step 27Step 27BX43●●●●● 9506 Door Panel (1) 950
44● Parts Needed For ●Roll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorStep 28Step 28Step 28Step 28Step 28BX44●●●●● 7817 Spring Support Bra
45Roll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorRoll-Up-DoorStep 29Step 29Step 29Step 29Step 29BX45STEP22222STEP11111CAUTION:CAUTION:CAUTION:CAUTION
46Step 30Step 30Step 30Step 30Step 30BX46STEP22222STEP1111111111Position right right right right right and left door jambsleft door jambsleft door jam
47Step 31Step 31Step 31Step 31Step 31BX47STEP22222STEP11111Spring Restraint CableSpring Restraint CableSpring Restraint CableSpring Restraint CableSpr
SOME FACTS ABOUT RUSTSOME FACTS ABOUT RUSTSOME FACTS ABOUT RUSTSOME FACTS ABOUT RUSTSOME FACTS ABOUT RUSTRusting is a natural oxidizing process that o
FFFFFinish:inish:inish:inish:inish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notic
6AAAAACCESSORIESCCESSORIESCCESSORIESCCESSORIESCCESSORIES... A6 WEB* Some drilling required to fit buildings without mid-wall brac
THIS PAGEWASLEFTBLANKINTENTIONALLY7
THIS PAGEWASLEFTBLANKINTENTIONALLY8
TTTTThe Fhe Fhe Fhe Fhe Foundaoundaoundaoundaoundation Ftion Ftion Ftion Ftion For or or or or YYYYYour Buildingour Buildingour Buildingour Buildingou
Comments to this Manuals