* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67545 21'Weather Stripping (1)66382Lower Door Guide (4)66183Roof Trim Cap(2 right & 2 le
Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 6114 Small Right Gable 2 2 6115 Small Left Gable 2 3
13Assembly by Key No. SS13112233334455666666667788991010111112121314141515151516161616161617181919191919191919191920202121222322242425242524242526
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2SS1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These piece will later be in-stalled at the top edge of the
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5SO18The floor frame must
1 Position right & left corner postsat the corners of the floor frame asshown. The angled end of each postmust be placed on top of all fourcorner
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The splice posts support the walls.1 Position a rear splice post at thecenter of the rear wall and fastenusing 2 nuts and bolts into rear wallangle an
The door jambs reinforce the dooropening and provide an attractivetrim.●●●●● 7311 Door Jamb (2)● Parts Needed For ●Door JambStep 8SS212173111STEPNOTCH
2 Rest bottom tab (large hole) out-side floor frame. Do not fasten tab atthis time. Repeat procedure for theremaining studs around the building.3 Fa
Each screw in the wall requires awasher.1 Slide side siding (5 board) intochannels of corner and splice posts,flat edge upward, slotted edge downresti
24The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
● Parts Needed For ●Gables/Roof BeamsStep 12ST25●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● Single Roof Beam Assemblies (4)●●
● Parts Needed For ●Roof Beam/BracesStep 13SS26●●●●● Main Roof Beam Assembly (1)●●●●● 6227 Roof Beam Brace (2)261 Fasten the track supports to thefron
27Step 14ST27● Parts Needed For ●Right Roof Panel●●●●● 7862 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta
1 Install a left roof panel at the leftrear corner of the roof.2 Install two roof panels in the se-quence shown on previous page.Follow fastener sequ
29Step 16ST291 Install four roof panels as youunroll the weather stripping tape, andpress it down, install the second ridgecaps 6869 overlapping the
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
1 Install two roof panels, left roofpanel, three ridge caps 6797 andright roof panel on the front of theroof as before.2 Fasten the roof panel ribs, p
1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA si
32●●●●● 3719 Door Handle Brace (2)●●●●● 10472 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6301 Vertical Door Brace (2)●
33Step 20SQ33● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation F09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRA
Comments to this Manuals